Avanti CF103 User Manual

Browse online or download User Manual for Unknown Avanti CF103. Avanti CF103 User`s manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 64
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
AVANTI WORK CAGE
User’s Manual and Installation Manual
Model SHARK
Page view 0
1 2 3 4 5 6 ... 63 64

Summary of Contents

Page 1 - AVANTI WORK CAGE

AVANTI WORK CAGEUser’s Manual and Installation ManualModel SHARK

Page 2 - Revision 2: 25/08/11

10 AVANTI Work Cage for Wind Turbines 4. Description of equipment 4.1 PurposeThe work cage described in this User’s Manual serves the following pu

Page 3 - DEVICES, SCAFFOLDING

User’s Manual 11 4.5 Components 4.5.1 Cabin overviewFig. 1 Double door Fig. 1a Sliding door112222567MATERIALE: 3M 7980 hvid polyesterfoliesort

Page 4 - Contents

12 AVANTI Work Cage for Wind Turbines 1224564561 Cabin2 4 door3 Drive and safety wires4 Guide wire 5 Wire guides6 Bottom safety stopFig. 1b

Page 5 - User’s Manual 5

User’s Manual 13 4.5.2 Cabin with safety gripping device, traction hoist, electrical control box and pendant control Fig. 2 1 Cabin2 Traction

Page 6 - Limited Warranty

14 AVANTI Work Cage for Wind Turbines Shark A B C D E F G1) N H L 380 960 600 650 475 75 1020/1150 990 3500 XL 480 960 800

Page 7 - Additional instructions

User’s Manual 15 Shark A B C D E G1) M N L 380 960 600 650 475 1020/1150 2400 990Fig. 3b Dimensions double door and half roller

Page 8 - 2. Cautions

16 AVANTI Work Cage for Wind Turbines Shark A B C D E F G1) M/N H M 380 600 600 650 285 102 660 615 3500Fig. 3c Dimensions r

Page 9 - 3. Instructions

User’s Manual 17 4.5.4 Drive system, safety gripping device and controlsFig. 4 Traction hoist LE500PFig. 5 Safety brakeBSO 500EFig. 7 Electricalc

Page 10 - 4. Description of equipment

18 AVANTI Work Cage for Wind Turbines 4.6 Safety devices4.6.1 Safety brakeElectromagnetic spring-loaded brake which en-gages automatically- on r

Page 11 - 4.5 Components

User’s Manual 19 gency release red button from outside the cabin as well as using a M5 triangular key from inside the cabin.4.6.11.2 Double door:A

Page 12 - 45541085

Date of publication:4th UL Edition: November 2010 Revision 2: 25/08/11Manufacturer:AVANTI Wind Systems A/S Høgevej 193400 Hillerød DenmarkP: +45 4824

Page 13 - User’s Manual 13

20 AVANTI Work Cage for Wind Turbines 5.1 Work cagea) Before every operation, ensure that the traction hoist, the safety brake, and all auxiliar

Page 14 - Shark A B C D E F G

User’s Manual 21 5.4 Automatic operation controlPerform only this inspection if function AUTO-MATIC is installed.a) Push EMERGENCY STOP button o

Page 15 - User’s Manual 15

22 AVANTI Work Cage for Wind Turbines Transportation of people in AUTOM. mode is forbidden. 6.1 Entry and exitTo ensure safe entry and exit:a)

Page 16 - Shark M 230V Roller door 80m

User’s Manual 23 If a power failure or an operation fault etc. interrupts the lift, a manual EMERGENCY descent is possible.7.1 EMERGENCY descenta)

Page 17 - Original traction hoist

24 AVANTI Work Cage for Wind Turbines 8. What to do if the safety gripping device engagesIf the safety brake engages simply disengage by pusing do

Page 18 - 4.6 Safety devices

User’s Manual 25 9. Remedying break-downs1. All tests and repairs of the electronic compo-nents should be performed by an authorised electrician o

Page 19 - 4.7 Other risks (hazards)

26 AVANTI Work Cage for Wind Turbines work cage goesdown but not upSTOPMotor hums loudly or wire ropes squeak,but the work cage can go both up an

Page 20 - 5.3 Control function

User’s Manual 27 work cage will go up but not down!STOPGreen lampnot lit although operation is normalSTOPIf these steps do not clarify the cause

Page 21 - 5.7 Wires and suspension

28 AVANTI Work Cage for Wind Turbines CAUTION! Wear protective gloves when handling wires.11.1 Parking the work cageAscend the work cage unt

Page 22 - 6. Operation - lift transport

User’s Manual 29 12.1 Yearly inspectionHave the entire system, especially the traction hoist and the safety brake tested by an AVANTI trained exp

Page 23 - 7.2 Manual ascent

20101118-SA13063 SA13063, 2003 December 01 2010 November 18 Issued to: AVANTI WIND SYSTEMS A

Page 24 - Safety wire

30 AVANTI Work Cage for Wind Turbines Fig. 18 Wire diameterFig. 19Wire strap/loop, which cannot be unwoundLoop knot forming when a wire loop is p

Page 25 - 9. Remedying break-downs

User’s Manual 31 13. Ordering spare partsFig. 21Rating plate onthe work cage back frameInformation signsOperating instructions inside the liftQUICK

Page 26 - Break-down Cause Remedy

32 AVANTI Work Cage for Wind Turbines Installation ManualPlease familiarise yourself with these instructions and the User Manual (Model SHARK) be

Page 27 - Break-down Cause Remedy

Installation Manual 33 Fig. 11.1 Parts list - SHARK Sliding door3031 32292627281341415743171156242112181619, 2042, 4336 37382132522 23839409104134

Page 28 - 12. Maintenance

34 AVANTI Work Cage for Wind Turbines Parts list - SHARK Sliding doorPos. Item no. Part description Pcs Reference1 45303112 Top(Shark L) 12

Page 29 - 12.1 Yearly inspection

Installation Manual 35 Parts list - SHARK Sliding doorPos Part no. Part description Pcs Reference36 45303143 Top stop bar /UL 137 79999503 Th

Page 30 - 12.2 Repairs

36 AVANTI Work Cage for Wind Turbines Fig. 11.2 Parts list - SHARK Double door1330429 27 14 15263132, 333910917115414019, 20161812343536213252122

Page 31 - (240 kg)

Installation Manual 37 Parts list - SHARK Double doorPos Part no. Part description Pcs Reference1 45303112 Top (Shark) 12 45303107 Spine(Sha

Page 32 - 1. Assembling SHARK cabin

38 AVANTI Work Cage for Wind Turbines Parts list - SHARK Double doorPos Part no. Part description Pcs Reference37 45303128 Bottom stop bar,

Page 33 - Installation Manual 33

Installation Manual 39 1918211 171233352381336162021282224272526134141563431325791029,30Fig. 11.3 Part list - Shark Half Roller door

Page 34

4 AVANTI Work Cage for Wind Turbines PageUser’s manual 1. Explanations of symbols used in this manual ... 7

Page 35 - Installation Manual 35

40 AVANTI Work Cage for Wind Turbines Pos Part no. Part description Pcs Reference1 45303112 / 45303175Top:SharkL/SharkXL 12 45303107 / 45303

Page 36

Installation Manual 41 Pos Part no. Part description Pcs Reference45512023 Counterweight 31 kg45541011 "Warning", UL - & CSA approve

Page 37 - Installation Manual 37

42 AVANTI Work Cage for Wind Turbines Fig. 1311224 28226181921271073325,2691343534141551117, 18223820133130291632301.4 Parts list - SHARK roller

Page 38

Installation Manual 43 1.4 Parts list - SHARK roller doorPos Part no. Part description Qty Reference1 45303326 Top Shark M roller door 12 4530310

Page 39 - Installation Manual 39

44 AVANTI Work Cage for Wind Turbines 1.4 Parts list - SHARK roller doorPos Part no. Part description Qty Reference45512005 Shacke, 2 tonnes4530

Page 40

Installation Manual 45

Page 41 - Installation Manual 41

46 AVANTI Work Cage for Wind Turbines 2.1 Tower topWire lengths depend on tower height and should be specified when ordering. The coils are marked

Page 42

Installation Manual 47 2.2 Measures for positioning of wiresFig. 6Minimum shaft clearance dimen-sions required for the work cage to run, and dista

Page 43 - Installation Manual 43

48 AVANTI Work Cage for Wind Turbines 2.3 Securing the guide wire - ground levelIMPORTANT: Before feeding guide wires through the platform place

Page 44

Installation Manual 49 2.3.4 Tensioning of the guide wires Ø12 mmTighten the wires by hand and mark with a water-resistant marker. Measure the d

Page 45 - Installation Manual 45

User’s Manual 5 8. What to do if the safety gripping device engages ... 24 9. Remedying break-downs ...

Page 46 - 2. Mounting of wires

50 AVANTI Work Cage for Wind Turbines Connections2.4.1 Power supplyDANGER!The electrical connection of the traction hoist must be made in accorda

Page 47

Installation Manual 51 CAUTION! Wear protective gloves when handling wires.2.5.1 Drive wire installation a) Remove protection guard above ro

Page 48 - 2.3.1 Wedge anchor

52 AVANTI Work Cage for Wind Turbines The drive wire is fastened as described in point 2.6.1 beneath and the safety wire is fastened in one of thr

Page 49 - 2.3.2 Tripod

Installation Manual 53 Fig. 13b Method 3: safety brake safety wire. Left wire with push spring on lift viewed from the front 2.6.3 Safety wire

Page 50 - 2.4 Electrical connections

54 AVANTI Work Cage for Wind Turbines 2.7 Wire fix alignmentHaving mounted the work cage, the wires, and the power, the wire fix fittings are adjust

Page 51 - Installation Manual 51

Installation Manual 55 2.8 Adjustment of top stop discThe top stop disc is adjusted so the operation limit stop switch stops the work cage in alig

Page 52 - – wedge anchor with spring

56 AVANTI Work Cage for Wind Turbines 4. Inspection before initial useAn officially recognised expert must:a) Inspect the work cage as specified i

Page 53 - 2.6.4 Steel beam

Appendix A 57 Appendix A: Adjusting instructions for overload limiter CAUTION! Avoid injuries by strictly following the instructions! a) Verifica

Page 54 - 2.7 Wire fix alignment

58 Appendix A3 Overload limiter 3.1 Function (Fig. 16)The traction hoist wire rope under load (1) ac-tivates the lever (3) by means of the deflect

Page 55 - 3. Danger zone! Sticker

Appendix B 59 Test report of annual inspectionOnly for work cages in wind turbinesDate of testing: Oper. hours counter: For each position check „

Page 56

6 AVANTI Work Cage for Wind Turbines Avanti Wind Systems A/S warrants that commencing from the date of shipment to the Customer, and continuing fo

Page 57 - 2 Adjusting instruction

60 Appendix BTest report of annual inspectionOnly for work cages in wind turbinesDate of testing: Oper. hours counter: For each position check „

Page 58 - 3 Overload limiter

Appendix B 61 Test report of annual inspectionOnly for work cages in wind turbinesDate of testing: Oper. hours counter: For each position check „

Page 59 - Appendix B 59

62 Appendix CReport of Defects found during annual inspection:Pos. No. in Item tested Description of defectTest ReportTested bySignaturewww.avant

Page 61 - Appendix B 61

AustraliaAvanti Wind Systems PTY LTDUnit 15 / 160 Lytton Road Morningside 4170 · QueenslandP: +61 (0) 7 3902 1445 · F: +61 (0)7 3902 1252ChinaAvanti

Page 62 - Report of Defects

User’s Manual 7 1. Explanation of symbols used in this manualSymbol Signal word Meaning Possible injury if not observedSafety instructions IMM

Page 63

8 AVANTI Work Cage for Wind Turbines 2. CautionsCAUTION! Avoid injury – follow all instructions!a) Installation and/or maintenance and/or opera

Page 64

User’s Manual 9 3. Instructionsa) Before and after using, check all parts for proper function and damage to component parts. Do not use a damaged

Comments to this Manuals

No comments