Avanti CF103 User Manual Page 54

  • Download
  • Add to my manuals
  • Print
  • Page
    / 64
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 53
54 AVANTI Work Cage for Wind Turbines
2.7 Wire fix alignment
Having mounted the work cage, the wires, and
the power, the wire fix fittings are adjusted
during the initial ascent.
a) Perform the tests prescribed in the User’s
Manual section 5 (page 19 ff.).
b) Install wires as shown in Fig. 14
By means of the oblong holes in the wire fix
fittings, adjust the fittings so that the two parts
pass each other easily, when the work cage
passes.
Fig. 14
Wire guide
Wire fix
Narrow wire guideStandard wire guide
Wire guide
Bracket platform (Optional)
Bracket platform (Optional)
Wire fix
CAUTION!
Wire fix shall be mounted on guide
wires at all platforms with max. 30 m
between each wire fix.
ATTENTION!
During the first run make sure the
power cable untwists evenly.
ATTENTION!
If tripods are used for guide wire fixing
tighten the wire locking device after
the first run.
Clic-on wire fixClic-on wire guide
Page view 53
1 2 ... 49 50 51 52 53 54 55 56 57 58 59 ... 63 64

Comments to this Manuals

No comments